Northwest Pipeline Corporation
Retrofit of a gas compressor station
Scope of Work :
Remove and dispose of existing asbestos-transite exterior cldadding, windows louvres, and exhaust mufflers.
Design, supply and install a new noise control system including an acoustical building, powered acoustical ventilation system, personnel doors, equipment door, and exhaust mufflers including analysis and strengthening of existing muffler support structure as required. ATCO guaranteed compliance with FERC and local authority regulations.
Client and Owner :
Williams Gas Pipeline - West
(Northwest Pipeline Corporation)
P.O. Box 58900
Salt Lake City, Utah
U.S.A. 84158-0900
Project
Location:
Suma 'A' Plant, Washington
U.S.A.
Contact:
John Esplin
Tel: (801) 584-6927
Technical:
Acoustical compliance achieved for combined noise from Sumas 'A' and 'B' plants.
<< back to Retrofit
Index
<< Download pdf here
|